Gouvernement Princier de Monaco
Print this page All the news
News
28 June 2024 Press release

Road repair on Boulevard des Moulins

©Direction de la Communication - Stéphane Danna

To ensure the ongoing maintenance of the urban road network, the Department of Urban Amenities informs you that repairs to the entire road surface of Boulevard des Moulins will be carried out from 1 July to 6 September 2024 in several stages:
- Preparatory work from 1 to 26 July from 8 am to 5 pm.
The road will remain open to traffic thanks to a manual traffic control system during the day and traffic lights at night.

- Planing and application of the road base asphalt from 29 July to 2 August at 6 am.
Work will be carried out at night to minimise the impact on traffic (traffic will be stopped during the work).

- Repairs to peripheral gutters from 5 to 27 August from 8 am to noon and from 1 pm to 7 pm.
The road will remain open to traffic thanks to a manual traffic control system during the day and traffic lights at night.

- Surfacing of the boulevard from 27 to 28 August from 8 pm to 6 am.
Work will be carried out at night to minimise the impact on traffic (traffic will be stopped during the work).

- Re-levelling of manhole covers from 28 August to 6 September from 8 am to noon and 1 pm to 5 pm.
The road will remain open to traffic thanks to a manual traffic control system during the day and two-way traffic at night.

During this period, the electric bicycle station on Boulevard des Moulins will not be accessible and bus routes will be diverted to Avenue Saint Laurent. A temporary bus stop will be created at 7 Avenue Saint Charles.

Autres actualités du thème

https://en.gouv.mc/A-la-Une-du-Portail/Road-repair-on-Boulevard-des-Moulins