- Homepage
- Quality of Life
- News
- Roadworks on Avenue Albert II from 21 November to 16 December 2022
Roadworks on Avenue Albert II from 21 November to 16 December 2022
Civil engineering works are being carried out on Avenue Albert II between 21 November and 16 December 2022, to link the planned Monaco Telecom facilities with Fontvieille Zone F.
The work will connect Monaco to the EIG or “Europe India Gateway” fibre broadband cable, and is vitally important to the Principality’s international connectivity.
Work is being carried out during the day from Monday to Friday, and will gradually extend from the stadium roundabout to the junction with Rue de la Lüjerneta.
Between 21 and 28 November, there will be no changes to traffic lanes. Restrictions will be introduced gradually as the work progresses, between 28 November and 16 December, according to the following calendar:
- From Monday 28/11 to Wednesday 30/11 inclusive: single-lane traffic on Avenue Albert II in the direction of the Fontvieille Shopping Mall roundabout.
- From Thursday 01/12 to Friday 16/12 inclusive: both lanes open, on either side of the roadworks.
For the duration of the work, the bus stop “Albert II” will be moved to a new location by the nearby parking areas, which will be partly blocked off.